Counting all receiving accessories 100% & storing separately. (Style wise color & size wise)
10% Fabric inspection (4 Point System) is done if damage rate is above 26%, after go to next or 100% inspection.
Fabric shrinkage testing.
10% Trim inspection is done if damage rate is above 2.5 100% check.
Bin card system maintained.
Separately needle stores available.
CUTTING
Fabric receiving, layering & cutting process is done according to color & batch wise.
Monitoring system has for Marker & Layer
Cut panel (Bundles) top – middle & bottom 7 pcs checking to cut Pattern.
SPC System Function for measurement & damages, including cutting dept.
Panel checking is done 100%. (If fabrics fail, after decide.)
Panel audit system
100% Numbering
Bundle tag & Bundle Chart issue to sewing dept.
PRODUCTION
Machine cleaning program has 3 times per day.
Machine oil leak monitoring records maintain.
SPC system has functioned for critical points.
Operation specification charts have each machine.
End line 100% checking garments.
Critical point’s measuring hourly.
Measuring garments 3 times per day.
End line Audit is done on AQL 0.65.
There is a Measurement Audit System.
There are label procedure, Button procedure, Needle procedure, Chemical use procedure & Metal free procedure in factory.
There is a maintain bundle system.
PACKING
Thread sucker & size separating.
Finish garments 100% ironing & pressing.
Ironed garments Pre final garment audit 100%.
There is a packaging audit system.
Packing Audit is done AQL 0.65
After ironing measuring garments 3 times per day.
All garments metal detected.
SAFETY PROCEDURE
PRODUCT SAFETY
Broken needle log sheets are maintained & Needle inventory check twice per day.
Needle / eye / pulley guards are available.
Button pull test thrice per day. The box attached each button attach machines.
Maintain the needle detector calibration log & Detector machine check 9 point system 4 times per day.
All metal items are recorded at all sections. Tools control system is available.
All trimmers & scissors are attached to the each machine.
Fusing peel born test twice per day & Test fusing glue line temperature for buyer request.
Monthly factory Product safety audit system.
All test machines are calibrated.
All pack garments are metal detected.
Metal Free Policy / Needle control policy / tools control policy / tube light braking policy / Incoming material procedure / metal detection procedure are available.
PERSONAL SAFETY
Fire drill are conduct & fire training once in every 6 month
First aid training conduct once annually.
There is a fire & first aid team for each dept.
Drinking water test every 6 month.
A certified nurse is available in any time per day
A qualified Doctor visits once a week
Canteen worker health certificate available.
All compressors & Steam boilers are calibrated.
Boiler certificate & Boiler operator certificate are available.